on 09-13-2012 11:40 AM
Hi All,
We created a PO and created two GR's against the PO. For the first GR, no inspection lot is created and for the Second GR, a inspection lot is created. Both the GR's has the same material document number. Inspection setup is set for the material and its working fine till now, but all of a sudden incase of multiple GR's, some are posted to QI stock and linked with inspection lot while the others has got no link with inspection lot.
Please suggest me how to proceed.
Thanks,
Satya
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Need more info. It's not the Q-info record as that would able to both of your receipts.
If you did two receipts you don't say if these are two different batches or not or if this is even a batch managed material. You also don't indicate if the stock went to QI in both cases, (which would be really weird).
So I am assuming you did a receipt of two different batches of the same material. (otherwise why make two receipts?).
My guess is if you look at the setting "control insp. lot" in the 01 inspection type setup for this material u will find I is setup as "material, batch, storage location". If so, then the first receipt was done for a batch you had already receipted to inventory and so no QI inspection was required. The second batch was a new batch and as such, was sent to QI for inspection.
If you want ALL receipts to go to QI, change the setting to "each material document, material, batch, storage location"
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
The material is not batch managed. I think the stock went to QI in both cases, in the first GR item - the stock went to QI and stayed there (no inspection lot is created). In the second GR item - the stock went to QI (inspection lot is created), UD is done and moved to unrestricted stock.
The Control Insp.lot is set as "For each material document item".
I still don't understand why the system is skipping the first GR item and taking the rest of the GR items in the same material document. (For eg: if there are 4 GR items within a same material document, system is not creating a inspection lot for the first GR item and creating inspection lot for the rest and moving smoothly).
Please let me know if you need further info.
Thanks,
Satya
To make sure...
1. Enhancement QAAT0001 : nothing implemented
2. Status GR doc. in material document : 1 (insp. lot assigned)
3. When you click "insp.lot" button : "no inspection lot assigned" messege shown
If above are correct, it could be SAP product error.
Please refer SAP note 48815 (possible inconsistency between MM and QM).
Please report this error to SAP support portal.
Regard, DoWook KIM
Hi Mahesh,
DMR is set up and assigned to inspection plan. The issue is when there are multiple GR items in a single material document, the system is not creating a inspection lot for first GR item. When there is only one GR item in a material document, it is working smoothly.
Thanks for the reply.
Thanks,
Satya
"For each material document item" for indicator of insp. lot control.
That's why I assumed this issue could be SAP product error.
1.Whatever the lot level was skipped or not, SAP should generate every inspection lot for all material document item.
2.Using customer exit.. we can interrupt generating inspection lot. But you told me there is nothing.
3.If you defined "no inspection" in quality info. record, the status GR doc. should be "4". But your case was "1". This means you don't use quality info. record.
Regards, DoWook KIM
Hello Satya,
I am following you thread for some time. Can you please let me know if you have any update on this issue from SAP.
I am having the same issue. On simulating the same in quality system, every thing is normal, but in production system the, no inspection lot is getting created but stock is moving to quality.
Please let me any if you have any updates.
Regards,
Vivek
Hi Satya,
I think u have maintain Q-info record (QI01) in Material vendor combination, in QI01--> Inspection control tap--> Inspection control as "X No inspection".
That's why some materials stocks are moving to QI and some or not.
Please check.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
HI Satya,
As i said Quality info record is used in Material, vendor & plant combination to evaluate & blocking the vendor with specific QTY /time. All these setting is necessary when u have activated the Qm procurement key in Material master.
Please see the thread:
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.