Long Term Planning: issue with report MCB) to show breakdown

Former Member
0 Kudos

Hello, Gents

I have:

- loaded volumes of finished goods #1 and #2 for the new year 2013  (MD61)

on a scenario  (view=MS33)

- run simulative MRP (MS04)

- transfer to LIS (MS70)

- start analyse MCB)

the issue: I can only see the ingredient volume required by these volumes of FG #1 & #2, as a total, for each ingredient

I woud need to have the ingredient needs with the breakdown of the finished goods #1 & #2 they relate to

can you help?

many thanks

KR - Loïc

Accepted Solutions (1)

Accepted Solutions (1)

rupesh_brahmankar3
Active Contributor
0 Kudos

Dear,

I think there is no pegged requirement in LTP. In LTP always have period base planning and analysis.

If you convert the stimulative order after that you can see the pegged requirement in MD04 and MD09 where you can identify the requirements in a specific raw mat for a specific Finished Good.

Only you can get the procurment proposal for a material level at the Ms04 screen level.

Other reports are.

MCEC - Material

MCEA - Vendor

MCEA - Vendor , this reports will help you to evaluate at differnt levels.

Also in additional you can also set up the data for the Inventory Controlling  with MCB& - Set Up Data  and do the evaluation with

MCB) - Evaluation


Regards,

R.Brahmankar

Answers (1)

Answers (1)

Former Member
0 Kudos

Thanks Rupesh

I am not happy fabout the answer  but thank you for your time

KR - Loïc