cancel
Showing results for 
Search instead for 
Did you mean: 

Change the default ATP category for SNP heuristic and capacity levelling

bsplibin
Employee
Employee
0 Kudos

Dear All,

Can you help on how to change the default ATP category for the SNP planned order by SNP heuristic?

For example, change SNP planned order from ATP category EE to ZE?

Also any idea on how to change the levelled SNP planned order to another ATP category?

Thanks,

Bin

Accepted Solutions (1)

Accepted Solutions (1)

former_member187488
Active Contributor
0 Kudos

Hello Bin,

I think first you'll need to understand the logic during SNP order creation.

When SNP order is created, system will first look for a key figure to create the order acccording to key figure function. For example, if SNP planned order is to be created, it will try to look for a key figure with function 2001. Then it creates the order according to the category defined for this order.

As you already know, both key figure function and key figure category is defined in /sapapo/msdp_admin.

So if you want to change the category of the created SNP order, you'll need to change the 'Category' setting from 'EE' to 'ZE' for the key figure 'Production (Planned)' with function 2001. Please change it in all aggregates (Standard SNP(1) reads aggregate 9AMALO, while SNP(2) reads 9ARE, 9AMARE, 9ALORE, 9AMALORE, ...).

I suppose this will also work in capacity view as you expect.

After you change the category of the key figure, if you still want the order to be displayed in this key figure, please do not forget to add the category into the category group assigned to the key figure. For example, category group 'PP1' for key figure 'Production (Planned)'.This should be done in customizing setting - define category group.

Best Regards,

Ada

bsplibin
Employee
Employee
0 Kudos

Thanks Ada, this helps.

Regarding the change of ATP category during SNP Capacity levelling. For example, SNP planned order with qty 100, standard category is EE. This planned order cause capacity overload, during capacity levelling, the system reduce the order qty from 100 to 80 and created another SNP planned order with qty 20 in another time bucket.

Can the two SNP planned order (80 and 20) change to another ATP category?

Best Regards,

Bin

former_member187488
Active Contributor
0 Kudos

Hello Bin,

As long as you changed the atp category of the key figure in all aggregates, I think you'll get your desired result

Best Regards,

Ada

Answers (0)