on 09-11-2012 11:11 AM
Hi all,
Usage decision has been setup in my
system, it is supposed to post the goods to unrestricted stock, instead
it is posting to quality stock. Please help me out regarding this. Am
new to QM, but would like to know more about usage decision and how it
is set up and the pre-requisites that needs to be carried out before the
decision is taken.
Appreciate the help.
Thanks
Satya
This message was moderated.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
go as per Doo-wook -kim suggest you
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
As I understand, you don't want the stock goes to inspection stock when you receive the material.
If right, do not select "Post to insp. stock" in inspection setup of material master.
Then the stock will go to unresticted stock directly, and an inspection lot will be generated.
Regards, DoWook KIM
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
1. Check the system status "SPCO" exist or not for few material's inspection lot which is not posting to unrestricted.
2. If those inspection lots have status "SPRQ" or "SPST", check the posting proposal and background indicator in selected set for usage decision.
3. Make sure that all inspector have authorization "Q_STCK_CHG" for stock posting.
If you find the common point for few materials, you can find solution easily, I think.
Normally the SAP never works like your doubt.
If you believe everthing correct, but SAP works wrong, you can report the SAP product error into SAP support portal, then they will answer.
Regards, DoWook KIM
Hi,
If you activate Inspection type in Material master, then after GR Inspection lot create automatically & Stock Shows in Quality Inspection stock.
For this you have to create Inspection plan for respective material. In inspection Plan you have to assign Master Inspection Characteristic, Sampling Procedure, Sampling Drawing Procedure.
Then You can do Result Recording , Usage Decision & Stock Posting( Quality stock to Unrestricted stock).
You can do direct UD ( Stock Posting from Quality stock to Unrestricted stock) if you don't want to feel results.
If you don't want Quality for this material, then Deactivate Inspection Type in Material Master. So that Stock directly goes in Unrestricted Stock.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Pavan,
Manual: After taking the UD, u have to post the stock to unrestricted in inspection lot stock tape, u have to feed the total stock in unrestricted then save.
Auto posting: In selected set (QS51),Catalog 3, take respective selected set code group 01,Posting proposal UD keep as unrestricted. while doing of this, after taking the UD u can save directly(stock will move to unrestricted stock).
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Prasad,
The case i am referring to is auto posting. In selected set (QS41), catalog 3 and i took the respective selected set code group 01, after that i cannot proceed any further.
"Posting proposal UD keep as unrestricted. while doing of this, after taking the UD u can save directly(stock will move to unrestricted stock)"
Please let me know how to proceed further.
Thanks,
Satya
Hi,
For Automatic Posting
go to Tcode QS51, Enter Catalo 3 in respective plant =>Create Selected Set => then Enter Code group & codes =>In Posting proposal in UD, you set as Un-restricted use stock.
If you set like above, then stock can directly post to Un-restricted use stock while saving UD.
Hi Pavan,
May be you are slightly confused. Actually after the GR, lot will be created and the stock will got to quality, you have to record the results in QE11 and do the UD in QA11. During UD only you have to post the stock to unrestricted.
Now please explain your issue and where you got strucked.
Regards,
Krishna Chandra
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Krishna,
Thanks for the response. I see that the Inspection lot is created (QA03 - display) for the material received. In Usage decision tab, i see that UD Code is AA 01 (ACCEPT-AUTOMATIC USAGE DECISION CODE) and quality score as 100, which shows that there is no defect with the material received.
In the usage decision (QA13), i see that quantity is correctly posted to unrestricted. But it still showed up in quality stock in MMBE and we need to create a new goods movement to transfer the stock to unrestricted.
I have attached the screen shot and i have added my questions, next to the pic. In the last pic, i see that the inspected stock is 0, where as the sample is 13. Does, it mean that inspection didnot take place.
Kindly suggest me.
Thanks,
Satya
User | Count |
---|---|
95 | |
11 | |
9 | |
5 | |
3 | |
3 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.