on 09-08-2012 8:35 AM
Dear sd gurus
i have one requirement ,we want to give delivery block only in stock transfer process
so what i do now?
thank u
Do you want to block the delivery in STO via SD Route when there is no Stock during Mv Type 641....from the supplying plant??
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear
exact lavanaya what asked means
ex ..........one company
plant A....STOCK 100 tons
plant B.....stock 200 tons
plant C......stock 20 tons
plant D......stock 5 tons
here urgently PLANT C need some stock from other plants so user wants to send the stock only from PLANT B , suppose if tryes to send stock from other plants system shouldn't allow
i think this is process
Delivery block can be given:
a. At configuration level:
In sales order type (VOV8) and in schedule line category (VOV6)
b. At transaction level:
In sales order (VA01/2), at header level and at schedule line level
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Lavanya,
Create different roles containing the same transactions with authorizations set plant level for all relevant movement related transactions.Users who need to work in both plants will need to both roles.
Ex:1. User 1 have authorizations at both plant level (Plant1 and plant2) with all related movement types means especially in your case is which type of movement types wants to used for transfer the materials from plant 1 to Plant 2.
2. But User 2 doesn't have authorizations to transfer the material from Plant1 to plant2 at movement type level or plant level.
I am not sure this usefull for you if you have any doubts please let me know.
Thanks,
Naren
we want to give delivery block only in stock transfer process
plant A and plant B are there no stock in plant B
I am not clear how many plants are there where you dont want to the material to be stock tranferred from Plant A
If your requirement is only for a specific plant, then have a different document type for that plant and dont maintain copy control. Besides this, you can also have a different shipping point. You should be aware, shipping point determination will happen based on the combinations of shipping condition, loading group and delivering plant. Here you differentiate the shipping condition in the customer master of plant-B and for this shipping condition, don't maintain any shipping point.
G. Lakshmipathi
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.