cancel
Showing results for 
Search instead for 
Did you mean: 

Does NC gets created if i enter out of range value in DC collect.

Former Member
0 Kudos

I have created a routing with 6 steps.

At 2 nd operation/ 2nd step of routing I have mentioned one parameter in its DC group with a specified minimun and maximum values.

Also, for this 2nd step  i have created a branch if the test at this step fails, it has to underg this branch operation before clearing NC.

Now, when i go to POD inetgrated, and select this operation and SFC,  a DC group screen comes at the bottom right portion of the screen.

If I enter some value that is below minimum value as specified in DC group does it log an NC automatically? Or to log NC there is only one way , that is to click on "LOG NC" button on POD integrated screen?

Accepted Solutions (1)

Accepted Solutions (1)

alexander_teslyuk
Product and Topic Expert
Product and Topic Expert
0 Kudos

It does not log NC if you enter some value that is below minimum value specified in DC group.

Yes, you may log NC clicking LOG NC button.

Answers (0)