on 08-24-2012 10:20 AM
Hi Gurus,
We have a batch management of the materials, When we do GR(Gate entry) at mov. Type 103, system does not create batch. When GR has done then system creates inspection lot.
Following error is showing at the time of UD-
Message no. QV044
Material 1000001 is to be managed in batches.
The usage decision cannot be made until a batch is specified for the inspection lot (010000001143).
Select a batch for material 1000001. Then you can make the usage decision.
For this I apply note 302854 & 170081 but system shows implementation status Cannot be implemented.
Please suggest me....
Hello,
For a Batch Managed Material, it is madatory to maintain/assign a Batch before doing UD for '03' Inspection Type Lots.
Assign Batch Number, then only system would save the UD.
Check SAP Note 170081 - UD: Possible to make UD without batch assignment
http://scn.sap.com/thread/1596715
Implementation is not possible of note as it doesn't contains any code correction instead steps to elliminate the error.
Hope this helps
Regards
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello ,
There is an SDN thread reported for the issue.
http://scn.sap.com/message/13412972
Kindly go through the same
Hope it is useful
Regards
User | Count |
---|---|
107 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.