on 08-19-2012 11:28 PM
Hi There,
We are doing inspection with physical samples.
Sample Drawing Procedure is defined: Samples are drawn based on the number of containers in which the batch is deliverd. (p2). A formula is set.
The system then pools the samples from above and partial samples formed, (to be destibuted to various labs) which is shown as " Partial samples to be formed" on the sample drawing instruction.
I want to hide this "Partial samples to be formed" part of the sampling instruction from the sampling instruction. Is it possible without getting into scripts ?
Regards
SG
No..its not possible to avoid this unless you make changes in the script itself.
Reason its appearing is its distributing sample as per "partial sample number" assigned @ char level of the Inspection plan.If you do not mention anything there ,by default system picks first item od SDP.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
108 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.