cancel
Showing results for 
Search instead for 
Did you mean: 

Proxy to File - In RWB - Status To Be Delivered

Former Member
0 Kudos

Hello,

I have made a scenario in PI with a proxy call from BackEnd to PI.

In dev system it works fine, but now in Quality system, I have for each message the status To Be Delivered in the Runtime WorkBench (Proxy Runtime).

Could you tell me if there is some pre requesite to implement in Backend (Quality System).

I had not such a problem in Dev system.

Thanks in advance

JC

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos
Former Member
0 Kudos

Thanks a lot $HRI,

It works fine now, I had a problem with the configuration of RFC Destination.

And your message was very helpful.

Regards

JC

Answers (0)