Hi Techs,
Please look in to the point below and help me on sorting out
Inspection plan contain 5 MIC and required to generate a sample of 5 kg for the all MIC
If i use sampling procedure with sampling scheme, each and every MIC i need to assign sampling procudure in other words each and every MIC 5 kg sample is recomended by the system..
but i want system should generate total 5 kg sample on entire inspection plan(ALL MIC)
And sampling qty will be vary as per inspection lot qty
PLS HELP WAITING FOR ANY TIPS..
ABU FATHIMA
Considering that UOM is always KG ,Create sampling procedure with sample type" fix sample" with sample size " 5" and assign this sampling procedure to each of the MIC's in task list.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Dear ,Please clear about your requirement.
Whatever sample size you want ,say "n" if you create SP with this fix sample size & assign it to all the MIC's ,then system will create overall sample size as "n" & not "number of MIC's X n ".
If your sample zie varies then consider the example of the "Percentage sample"
Hi Abu,
Sujit has correctly explained this. Let's consider the case of FIXED_5 samples for the sake of simplicity.
Whatever type of sampling procedure you use, you should assign sampling procedure against each MIC in inspection plan to calculate sampling size in are using task lit or material specification.
Regards,
Anand
Hello experts
Any comments pls...
Abu Fathima
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
98 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.