Hi all,

have the following prob:

From PP-Order I perform WM-staging, TR is created

but when I want to convert this into TO I get error:

Storage bin (ProductionOrder) does not exist in Storage Type....

In the relevant MVT the flag for DYNAMIC Storage Bin is set as well as in LPK2, Control Cycle.

When I remove those and use a physical Bin, all works fine.

How can I use dynamic option?

Regards

Thomas

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi,

Just tick 'dynamic bin" check box in control cycle (LPK1/LPK2). In movement type leave it blank.

BR

Former Member
0 Kudos

Hey,

I got it: It is up to the putaway strategy (I have "F") and a fixed bin is maintained in master data.

If I swith strategy e.g. to "_" it works.

Is it possible that it works despite?? I need "F", due it s replenishment storage type.

Regards