Add task detail to DP80 quotation

Former Member
0 Kudos

Hi

We have created a service order (IW31) with all the details on the task lists. Some of the tasks have the same activity type as the hourly cost + rate is identical. When we create a quotation via DP80, these lines are grouped together. How can we show this information in DP80 and in the quotation? Is there a standard solution for this? If not, then we are thinking of adding them as text line but we don't know how.

Kind Regards

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hi Jimmy,

If your Tasks has same activity types, via RRB system is going to convert all those tasks and

add it as one Material.

You can try below options:

  • If Number of Tasks are not too many then you can think about creating separate Activity Type.
  • And define separate Material Codes for the same.

Second option is to create separate Material Code and add the same in Quotation directly.

Just check the Item category TATX which can be used as Text Item is being determined.

Regards,

Mahendra Jani.

Former Member
0 Kudos

Hi Mahendra

The first option is indeed a valid one but we would have many activity types to maintain.

For your second option, do you refere to a manual action or a automatic? If this would be automatically, then we would have these items in a user exit or Badi. Any idea with which exit/Badi we can achieve this?

As we are using service order to quoation scenario, is there an option to copy changes from the sales order back into the service order?

Former Member
0 Kudos

Hi Jimmy,

I was referring to manual entry.

I have never tried for Automatic updates so not aware about User Exit from DP80 to Quote.