on 07-26-2012 8:37 AM
Dear all,
We have installed SAP Netweaver BI 7.3 (ABAP Stack) and SAP BPC10 into our development server and we are facing problem connecting to the BPC via EPM in Microsoft Excel. For your information, we have patched the system to the latest patches. Based on the error message, it seems that there were no environments available on the server. I've activated the environment through the program UJS_ACTIVATE_CONTENT. Please advise what are the possibilities to resolve this problem. Thanks.
I solved the problem by verifying that an error in the installation created the SHELL wrong. Also missing UJT_MIGRATE_75_TO_10 program execution.
Is there a manual for this program that can be downloaded.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hello!
You could solve this problem?
I have the same problem and I'm not finding the solution.
If you can help, thank you very much.