I am testing a small network, I had created Product P1, L1 at a main DC and two outer DC as L2 and L3. P1 is extended to all locations and T-Lanes created from L1 to L2 and L1 to L3. P1 is externally procured item at L1 while L2 and L3 have forecast. When I ran a ctm profile to roll-up the demand at L1. CTM

reads demand elements but not created supply elements like stock purchase requisitions at L2 and L3 and Purchase Requisitions at L1. What am I missing?

Interestingly, if I run Network hurisitic from planning book it created all respective supply elements.

Thanks,

Sam

Accepted Solutions (1)

Accepted Solutions (1)

m_manimaran
Active Contributor
0 Kudos

Hi,

Could you please check the below points?

How did you check that CTM reads the demand elements?

Have checked the consistency of your master data selection?

Is your time stream is long enough to consider the demands?

When you run CTM, did you get any error or any other message?

Regards,

Manimaran M.

Former Member
0 Kudos

You're right. I checked my time stream which was not correct.

Just to give you an answer that when I ran CTM it had not given me error messages.

Thanks

Sam