on 07-19-2012 5:07 PM
Hi Friends ,
We are having some materials for which user wants only UD and not RR . I know without RR , we can do UD because system will give warning msg only . But I want to ask is creating a inspection plan (QP01) is mandatory for UD also even if I dont want RR .
Actually I have tried using inspection type 01 (GR against PO) in a material's master and have not created the Inspection plan for it . Lot is getting created but it is under CRTD mode and not released . Without plan its not allowing me to do UD .
Also , I have tried removing tick "Inspection with task list" in material master under inspection setup . But it is not allowing me to do so and giving me error msg "You can only inspect by characterstics using the inspection specifications" .
Can somebody explain the steps for doing this scenario where on UD is to be done . I am new to QM so please explain all the steps .
REgards
hi,
There are two ways possible.
1. Activate Insp type 01.
Uncheck fields, Inspection With task List, Inspection With material Spec., Auto Assignment and insp. by Chars.
You have to uncheck all these fields.
After GR, Insp Lot will be created with REL status. You can give UD.
2. Activate "Post to Insp stock" field in PURCHASING" view.
At the time of GR, stock will be posted in Quality. and can be posted to Unrestricted or Blocked using Movement types by MB1B.
Set Authorizations accordingly.
According to me 2nd way is better.
Regards,
Amol
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You can do that!
I would suggest to customize new inspection type for this requirement with above settings rather than modifying existing set up for 01 inspection type.
For your existing entries, you may have to create inspection plan and clear the same.
Regards,
AR
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi ,
you must also unclick the two check boxs,
Automatic assignment and Check Chars
if you don't want to do RR after inspection lot was created.
btw, you can assign the sampling procedure while set up inspection type.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
110 | |
12 | |
11 | |
6 | |
5 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.