cancel
Showing results for 
Search instead for 
Did you mean: 

Change pointers for Master Data in ECC

Former Member
0 Kudos

Hi,

When the Integration models  with master data are activated, change pointers are evaluated & master data in APO is updated.

My question is: At what moment the change pointers are considered as processed in the system?

Is it when the IM are activated or when the changes are saved in APO?

regards,

Mohit Goyal

Accepted Solutions (0)

Answers (1)

Answers (1)

rajkj
Active Contributor
0 Kudos

Hi Mohit,

Considering only master data changes and change pointers, we have manual or auto options to transfer the change from ECC to APO. But, for both the options, basic prerequisite is active integration model.

With manual transfer: The change pointers are collected (by means of table entries) and upon completion of change transfer the change pointers will be deleted (say processed).

With auto transfer: As soon as the change pointer is recorded, it will be transferred to APO immediately and the corresponding change pointer will be deleted.

Change transfer will take place through CIF queues and hence, the change pointers processing will not depend on persistence status of corresponding master data in APO.

Thanks,
Rajesh