on 07-17-2012 1:08 PM
Hi
I have unique client requirement
Through FB50 I have made these postings
Initial Posting:
Debit Engineering WBS Comp Code Z $100
Credit Cash $100
Then I have made adjustments to the following entries to the following wbs elements under different company codes those are created under one project code.
The subsequent posting is not settlement, but a “fake” settlement using an FI transaction say FB50
Credit Engineering WBS Comp Code Z $100
Debit Engineering WBS Comp Code A $25
Debit Engineering WBS Comp Code B $25
Debit Engineering WBS Comp Code C $25
Debit Engineering WBS Comp Code D $25
Then the last step is to settle the WBS’s in comp code A, B, C, D which puts the cost on the AUC.
This is not happening
Please help can this scenario is possible or not or any other alternative methods are available for it.
Thanks in advance
Kareem
Hi Kareem,
Try this with KB11N(Manual re-posting of cost).
If there is any error message then please share it with Number.
Regards,
Pranav
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Kareem,
Check-
1. For WBS A,B,C& D; the posted amount $25 is showing in CJI3(Actual cost).
2. For all above 4 WBS, Individual AUC has been created or not.
3. Run CJ88 for these 4 wbs individually and check for $25 is in list of settled amount or not.
If you are debiting A,B,C,D then it must be in CJI3. If AUC is not created(AUC status on WBS confirms same) then create it and cost will settled definately.
If there is any error message at any stage then please share it with us.
Regards,
pranav