on 07-17-2012 12:43 PM
Hi All,
I have (LIVE) ECC EHP5 system and wanted to integrate with GRC10.0. I have 35000+ roles LIVE in the system. I do not want to disturb these roles. As phase 1 project, i will create new roles using GRC10.0 for other small project which is kicked off.
Kindly note that, the earlier Business roles(35000+) are segregated based on module. While for new project, i want to create Process wise, it will contain cross module t-codes in one single role. It is possible that the same t-code access is present in old roles. Based on this history my questions are
Please advise...
Best Regards
Imran
Hi Imran,
1. Yes it is possible to integrate SAP GRC10.0 into ECC with new roles only.
The only thing is to do is set the status of the role as "Production" and provisioning as "Yes" for all those new roles.
2.No it will not impact the old setup.
Regards,
Silky Sharma
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Imran,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Sreya Gupta
Could you please suggest this issue
We have ECC and SRM systems, We configured the GRC10 System to that
Now we built a new ECC system and import the complete data into New ECC system and Kept the old one like that only for reporting purpose and org structure.
Now how can i change the GRC box from previous ECC system to newly built ECC system
Please do the needfull
Regards
Deepak
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.