could you please help me on how to schedule manually operations network (more than 5 consequetive operations) at the same time to the desired date?

I tried to adjust schedule strategy with "consider fixed and dynamic pegging", consider "order relationships", but it did not help.

It schedules one operation to the required date, but not the operation network.

thank you

Alla

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello Alla,

Do you want to schedule all operations to the same date? In that case use the 'Specified Date' option for desired date in the scheduling strategy. Then select all operations in the network, and click on reschedule.

If you want to schedule all operations based on pegging relationships, use the option 'Consider Fixed and Dynamic Pegging'. However, it is not possible to maintain a threshold for earliness/lateness in case of operation networks.

Regards

Jibi