cancel
Showing results for 
Search instead for 
Did you mean: 

Stability Study - Inspection Lots creation

Former Member
0 Kudos

Hi Gurus,

We are trying to use the stability study standard in SAP but it does not working according our expectation.

1) We defined the strategy maintenance in IP11. Some frequencies were defined as dially;

2) The inspection plan was created;

3) We've used CWBQM to assign the inspection to strategy maintenance and we've selected which frequencies will be used by Stability Study. The frequencies selected were: 01 day, 02 day, 03 day, 06 day, 10 day and 14 day.

4) We've created a stability study using QST01 and notification ST was selected;

The system created inspection lot for day 01, 02 and 03 correctly... We thought the system could create inspection lots for day 06, day 10 and day 14 according our selecting in CWBQM. However, the system created one inspection lot for all days... day 01, 02, 03, 04, 05, 06, 07, 08, 09, 10, 11, 12, 13 e 14. I mean, the system is not consering the frequencies that we've selected in CWBQM.

I was wondering if you could help us to identify any master data, customizing is missing? I'd be glad to hear your opinion if this functionality (Stability Study) works correctly in SAP standard system?

Best Regards,

Valdevair

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

Hello,

you can manually create an inspection lot for the initial sample, in order to perform the initial test. Once you have created the inspection lot, you can inspect the initial sample, record your inspection results, and then complete the inspection. The results of the initial test will help you decide whether or not you want to continue the stability study using this physical sample.

Please look into the below links for Stability Study:

http://help.sap.com/saphelp_470/helpdata/en/58/b8b93b07b3c342e10000000a114084/content.htm

http://scn.sap.com/thread/3159451

http://scn.sap.com/thread/2155137

Hope this helps

Regards

Answers (2)

Answers (2)

Former Member
0 Kudos

please check the Maintenance strategy that you have defined , the strategy for stability study should have offset and not the Cycle length.

Former Member
0 Kudos

1.Check what you get in Plan date & due package under schedule call item in IP03

2.check Main.Package & Sceduling period.

Former Member
0 Kudos

Dear Sujit Gujar,

I've attached the screens were copied from IP03.

We thought the system could create inspection lots according with the cycles itens were selected in CWBQM...

I'd be glad to hear your comments.

BR

Valdevair