on 06-29-2012 4:43 AM
Hi,
I activated QM view in material master with inspection type 13.
I created the plan inspection (QP01). In the CA21 I assigned the inspection characteristic. My Rate Routing (50000001) is linked to the production version.
I created inprocess inspection lot for the production version using MFPR, but when i try to recording the results there is this error:
Message no. QE214
And when i observe the inspection lot, i can see that in the rate routing (50000001) is not the inspection operation with the characteristic that i assigned (control Key QM04). Only i can see the production operation. And i can´t delete the lot becasue it´s open yet ('New Lot for Rep. Manufacturing' is not allowed for INL 130000000000, because no status is set to permit it).
Please, somebody help me, i don´t know what it is wrong.
Thank you so much.
hello same problem I am facing
what is the conclusion of this query?
when I am creating lot 1st time from MFPR in QA32 in result result recording only one characteristic visible but when i create lot second time from same steps then it's showing all characteristic which are assign in rate routing.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Don't resurrect an old post.
Please open a new question and link in older, possibly relevant posts.
Craig
Apologies Craig. I have opened a new post. Here is the link
https://answers.sap.com/questions/13114591/in-result-recording-not-showing-all-characteristic.html
Have you come across this issue ? Would appreciate if you could have a look and comment
Many thanks.
Regards,
Talha Khan
Hi, i could to solve this trouble, in my inspection lot i created a new characteristic, like that i could recording the result and usage decision. After that, i could create other insp lot, and it´s reading the characterist from my rate routing. I only modify was the unlock the MIC in the rate routing, and creating other lot i could update that change in my new inspection lot.
Thank you so much to Sujit and Manish to help me.
😃
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
One doubt ,You said rate routing assigned to production version.
I have query about the operation & Inspection char in rate routing.Have you assigned them.
Also check the date of rate routing !
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sujit, thank you for you help.
I assigned the rate routing to productiction version.
In the rate routing i have two operations, one with PP01 key control and other one with QM04, this last with the MIC assiged. I created rate routing with usage 1 (production) and status 4 (released general).
Inspection lot created in the MFPR, only read the operation with key control PP01, not the inspection operation (QM04), and for that reason it can not read the MIC.
When i check my rate routing, and it´s ok.
Thank you again 😃
Luz V.
Hi Luz
You r working in a repetitive manufacturing. Well you want to generate the lot with MFPR and to do result recording. Here is the setting for that
1)Create rate routing with CA21 and assign contro key to operation in which inspec. chars is ticked and attached inspection chars to that operations which you want to check.
2) Activate inspeciton type 13 in QM View of that material.
3) Create inspection lot with MFPR and suitable production version , you wouldbe able to create the lot if no inspection lot of that production version doesnot exist , otherwise you donot able to do that.
Manish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Manish, thank you for your answer.
I did it. But, my inspection lot don´t work, it don´t read the characteristic that i assigned in the rate routing. For that, i can not create other inspection lot for that production version. I don´t know how i can update de data master in this lot and/or find the error and the lot read the characteristics assigned in the rate routing.
Thank you.
Luz V.
I think routing should have been created( through CA01) & not the inspection plan in QP01.
then assign the rate routing if req ! While assigning everything like bom & routing to Production version make sure that you click on "Check" & Green light gets activated.Then you can proceed with MFPR.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Sujit, Thank you to answer so fast.
I check the production version, no errors found. I tried with MFPR, it didn´t work again. I created routing (CA21), i don´t sure if i can use a routing (CA01), i am working with a repetitive scenario. My inspection lot is linked with the rate routing.
Thank you.
User | Count |
---|---|
103 | |
12 | |
11 | |
6 | |
5 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.