on 02-13-2007 4:31 PM
Hi all,
We have the following general questions regarding SAP GRC Process Control:
1) Assume that we have set up 5 different SAP Connectors in Process Control. When you configured a specific rule and control and then, schedule the job for such control, how does the system (SAP Process Control) knows which back-end system needs to be accesed for such control?
2) In which language are the out-of-the box rule steps's script coded? In which different languages can those scripts be coded, what is to say, in which language can we code our own scripts?
3) How is the detailed flow between SAP Process Control and SAP Back-end system?
Many thanks. Regards,
Imanol
....
...
null
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
89 | |
10 | |
10 | |
9 | |
6 | |
6 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.