PP-QM Integration in Process Order phaze quantity problem.

Former Member
0 Kudos

I  am facing problem in QC - PP as below.

We are using Process Order with QM integration. When we record results of 03 Inspection Lot in QE51N of QC operation Confirmation Pop up has been displayed. In Pop up message "No Confirmation" option selected by default. My requirement is to select "Final Confirmation" option with quantity confirmed in previous operation.

I have define "Automatic valuation based on insp point" in QM inspection point.

Please Guide me how to solve this.

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Check OPK4 final confirmation parameter for control key of relevant operation.

Former Member
0 Kudos

Dear Sujit,

Thanks for your support and information, i have check it. But may be this setting resides in recipe setting of QC operations, i am not exactly remembered. Let me know if you know about this.