Dears
I have a requirment like below,
When i create a PO to a vendre first time system need to
trigger a special inspectin plan for GR
if the above inspection plan in ok then for next PO i need to have a different inspection plan against GR
Is it possible to map this by using Supply Relationships
Pls tell me the detail step how we can assign different plan for different status
and aslo how it ppossible to cotrol PO QTY in status managment
Thanks in advance
Abu Fathima
1. You can assign the supply relationship status in QInfo record.
You can assign inspection type 0101 for model series ( initial pilot series etc)
01 production series etc
Create different task list for different inspection type.( means in customization of these inspection type assign different usage)
2. Status mgt do not play any role in qty as such ,its quality info record"Qty release" tab which control qty in PO.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi sir two clarification
1.So by using in quality info record we can not control the PO qty for pilot serios and production etc...
2.If we GR a PO quantity partially by two times then system changes the status in quality info recored .how we can control this, changing the status in Quality info recored for different PO only
Abu fathima
1.So by using in quality info record we can not control the PO qty for pilot serios and production etc...
- No
2.If we GR a PO quantity partially by two times then system changes the status in quality info recored .how we can control this, changing the status in Quality info recored for different PO only
- No again not std one.
may be you have to check the possibility of customizing a table where in you can have check in PO qty & status.