Requirement:
When deliveries from ABC to XYZ CN are created, they shall not contain both anti-dumping materials and normal materials. Anti-dumping materials can only be combined with anti-dumping materials in deliveries. When anti-dumping materials and normal materials have separate deliveries, the dispatch of normal materials will not be delayed by anti-dumping materials.
plz can have the steps for configuration.
Thanks in Advance
Just think whether you can use the option of delivery group in sales order if the user knows which all are the anti dumping materials. Else you have to have an indicator in material master and then have a check in sales order or delivery for the same.
regards
Harish
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Have two sale order types for this and by differentiating Item Category Group for normal material and anti-dumping, you can achieve this requirement by having assignment in VOV4.
G. Lakshmipathi
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
thanks
plz see this Query:Replacement of material process through IDOC
Dear Vinod
how can you maintain the shipping point in material master? Shipping point is determined by shipping condition + loading group + plant combination. So are you talking about a new loading group in material master?
Laksmipathi has asked to maintain different item category group in material master for normal items and anti dumping items.