For a material , when creating a sales order the checking rule is selected by the system as x. The availability check for the material is Y. And in the configuration,the Availability check is having four checking rules assigned to it.
The question is, how is this checking rule is picked by the system when there are three more rules assigned to the availability check. Where is the setting in the system.
Please help me out.