on 06-09-2012 10:18 AM
After running SNP Optimizer can any one tell me on what basis distribution demand planned and production planned is calculated,which formula is used for calculation?
Thanks
Poorna
Hello Poorna,
What I can say is that optimizer is a really complex tool, so the results/calculations could have
different results for different scenarios.
Please refer to the online SAP Help below, it has lot of information about how Optimizer behaves:
http://help.sap.com/saphelp_SCM700_ehp01/helpdata/en/09/707b37db6bcd66e10000009b38f889/frameset.htm
I hope it helps in your doubt.
With the best regards,
Michel Bohn
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.