Projects - Moving Costs Manualy

Former Member
0 Kudos

i have a problem with numerous projects in my system were costs have beeb alocated to wrong projects

i have moved the costs using a manualy using t-code kb15n (enter manual cost allocation)

it has come to month end and the projects i moved the costs on have not settled the incorrect ammount off the projects

the incorrect projects had been settled the previous month is this my problem and how can i get the projects to re-settle as our lost provision is growing and growing.

thank you in advance

Accepted Solutions (0)

Answers (1)

Answers (1)

former_member230675
Active Contributor
0 Kudos

try to reverse the settlement and move the costs manually and do the settlement again.

anyway without knowing your whole scenario it is difficult to comment