Hi Experts,
I am getting a problem at the time of creating a sales order.It is not confirming the availability for the material which is excluded from MRP.Kindly give your views
Thanks in Advance
Rahul
Hello Rahul,
The behaviour you are seeing is standard. Basially, in standard system, it's not possible to exclude the storage location from MRP but still include in ATP run.
You can use user-exit 'EXIT_SAPLATPC_001' to either change the customising settings or exclude the sloc from T_ATPCSX. Or use EXIT_SAPLATPC_002 to change the result T_MDVEX.
Regards
Amber
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
What is Checking Group in Material master sales general plant
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
dear,
did you check out the material master settings in MRP 3 view (Availability check)?
regards,
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Yes I hv checked it in MRP3.It is correctly maintained.
My scenarios is like this:
I have 2 storage locations in one plant out of which one storage location is MRP excluded.It is confirming availability from one storage location but it is not confirming availability from the storage location which is MRP excluded.