Hi,

I´m having problems ejecuting "Authorization  Synch" (RAC_PFCG_AUTHORIZATION_SYNC)

The Error message is:

Program for Authorization data Synchronization

Starting authorization sync for connector XXXXXXX and language EN

Correctly define the logical connection in CCITS

PFCG authorization sync failed with errors

any ideas?

We have the table grfnconnscnlk  with the 4 scenarios configurated (AUTH, PROV, ROLMG, SUPMG).

I'had tried changing the languages to ES or DE and the error continues.

thanks.

Accepted Solutions (0)

Answers (4)

Answers (4)

Former Member
0 Kudos

Hi Paula,

Please check  if logical connector names are defined in
SAP Img>Governance, Risk and Compliance>Common Component Settings>
Integration Framework>Maintain Connector and Connection Types in
Define Connectors

If it is SAP system for which you are synching users, the logical port
shold be same as Target Connector.

Best Regards,

Smriti

Former Member
0 Kudos

Hi Paula,

This is a tricky issue. I also faced this error recently.

You need to ensure the connector is maintained in SPRO->GRC->Access Control->Maintain Connector Settings

This setting to be maintained once the connector is defined in the integration framework which is a basic step.

Let me know if this could help in resolving your issue.

Regards,

Venkata B

neerajmanocha
Product and Topic Expert
Product and Topic Expert
0 Kudos

Hi Paula,

Ideally this issue comes if the configuation setting is not as per recommendations. I would recommend to check your all the settting given under below sap notes and do the needful, if there is anything misisng.

1656440 - Error - 'Correctly define the scenario handler class in CCITS'

1562760 - AC10.0 - Intergration Scenarios to Connector link

1575072 - GRC AC2010 Scenario-connection type linkage for LDAP

Hopefully, this should be resolved after this configuation.

Thanks & Regards

Neeraj

Former Member
0 Kudos

Hi Paula,

Kindly follow the instructions under SAP Note #1562760

Regards

Shaily

Former Member
0 Kudos

Hi,

Please check the following point from post installation check:

In case you get an error with a "CCITS" message during synch jobs go back and check the connections in SM59 so that those do not contain any (white-) space characters.

Regards,

Ajesh.