Hi, we have come across a problem in our warehouse.
The goods input has been made for material 40527, the delivery bill is written 233 kg, the actual amount is 180 kg.
The material 40527 has QM view active, so 233 KG entered into Quality stock by 101, then system automatically made 102 for 53 kg, net input = 180 kg.
Now it is seen that the delivery bill amount 233 kg is invalid, it is wrong calculated, another goods input has been made (207 kg) for the same material, and this has been QA approved , used and consumed in production, no problem with the second goods input.
We want to cancel the goods input of 233 kg, it says stock is 180<233 , you can not.
We want to cancel the 102 movement first, but then we get the error that we should do it via QM.
Where and how can I cancel this second QM-generated movement? Thanks a lot
Hello,
Please refer SAP Note: 48815
Other setting are:
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for the reply.
But the movement we want to cancel is the 102 movement, the one that's been made automatically.
Thus we can add up it 233 again and cancel it completely.
Now we have 180 in quality stock, there is an ins lot for that goods input.
We cannot cancel the 233 Goods input, neither we can cancel the 180 in the same party, bec. of the ins. lot.
Could it be possible if we cancelled the ins. lot thru what you've posted?
Hello,
Please go through the link below for similar issues:
http://scn.sap.com/thread/610536
http://scn.sap.com/thread/2062754
Hope this is useful
Regards