on 05-15-2012 8:25 AM
Dear SAP-APO gurus,
We have a bsiness case when we manually adjust at SNP Plan while capacity leveling - to optimize resource optimization. Also it often happens when we have SNP Orders created manually.
This causes the SNP Planned orders fixing.
Though afterwards my users want to re-run manually at Planning Book SNP HEURISTIC (assume demand sustuation is changed) - but because of fixed orders the production situation does not much chage (e.g. there is a need to reduce production) - SNP Orders "stay not touched".
Pls., let me know the way we can collectively unfix SNP Planned orders (which t-code?). Or can we change HEU profile so that it will consider and re-plan fixed orders?
Thank you in advance, Nazar
Hi Nazar,
In stead of unfixing later, you can set the data in such a way that no manually created SNP order is automatically fixed.
Use t.code /SAPAPO/MAT1 to update location product master, select tabstrip SNP2 and set the flag for parameter 'No fixing' under SNP interactive order creation.
Thanks,
Rajesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi Rajesh,
I am aware of this option. However you know sometimes we need to have SNP Heu consider these ones.
I was digging in further and at /SAPAPO/RPP4 there is a "Lock" (Firm Orders/Schedule Line) - there is a possibility to filter out & select all SNP Orders and collectively undo firming.
Reards, Nazar