Dear SAP,

      I want to create calibration process in SAP QM, But i never work on it.I want to know as a QM point of view,what r the data should be maintain by QM Person in SAP QM.What r the steps to follow &If any reference site is there then tell.What r the configuration steps required to activate calibration process.

Best Regards,

Asif,

Accepted Solutions (1)

Accepted Solutions (1)

anup_patil3
Active Contributor
0 Kudos

Hello Asif,

Details as below:

Config: Assign Calibration inspection type-14 to respective PM Order type.

Master Data:

1. You first create Maintenance Plan (IP41). Considering you've already an Equipments (IE01), General Taks List for equipment (IA05) created/available in system in PM module.

2. Then you schedule Maintenance Plan using IP10.

3. After Scheduling, system generates a Maintenance Order automatically in background.

4. Then you release Maintenace Order (IW32). Once PM order releaseed, an inspection lot is generated (Based on Configuration done).

5. Then process the Insp Lot (UD)n depending on which a status will be updated for an equipment.

6. Subsequently, process the Maintenace Order & close it.

Also refer http://help.sap.com/printdocu/core/print46c/en/data/pdf/QMIMIL/QMIMIL.pdf

Hope this will help. Revert if any more info required.

Regards,

Anup

former_member216607
Participant
0 Kudos

Hello Anup,

     Thanks for your valuable input, But whatever you mention on top all that be come from QM module or we required help of PM module too.Is every thing we have to maintain in QM module only?

     Is any PDF document is there for

1) Create Equipment whose calibration need to be done(IE01)

2) Create Equipment tasklist (IA01)

3) Create maintenance plan(IP41) and assigne taklist and order type(PM05)  in it.

4) Schedule maintenance plan(IP10) and can do manual call.

Regards,

Asif

anup_patil3
Active Contributor
0 Kudos

Hello Asif,

Yes, definitely you need PM help for equipment, general task lists setup for calibration process.

Talk to your PM consultant. Or refer below link for PM processes & do the needful.

http://help.sap.com/printdocu/core/print46c/en/data/pdf/MYSAP/SR_PM.pdf

Revert if any issue further.

Regards,

Anup

former_member216607
Participant
0 Kudos

Dear Anup,

     We do not have the PM module,what r the thinks QM person do in calibration process, without taking the help of PM person.

Regards,

Asif

Answers (2)

Answers (2)

former_member216607
Participant
0 Kudos

Hello Manish,

     Thanks for your valuable input, But whatever you mention on top all that be come from QM module or we required help of PM module too.Is every thing we have to maintain in QM module only?

Regards,

Asif

former_member216607
Participant
0 Kudos

Dear Manish,

          From PM only the order will released or what?our scheduling is to be maintain by PM person?

former_member184536
Active Contributor
0 Kudos

Hi Asif

For Calibration inspection

1) Create Equipment whose calibration need to be done(IE01)

2) Create Equipment tasklist (IA01)

3) Create maintenance plan(IP41) and assigne taklist and order type(PM05)  in it.

4) Schedule maintenance plan(IP10) and can do manual call.

As soons as u save, inspeciton lot with lot origin 14 is generated.

In customizing assing order type PM05  to inspection type 14.

With regards