cancel
Showing results for 
Search instead for 
Did you mean: 

BI BG jobs are failed

Former Member
0 Kudos

Hi Team ,

BI Background jobs are failed in ECC system , i have attached system log, runtime error and also BG job job , how we can avoid these error in future , please advise .

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Hi John,

Check Dataload status logs in BW system throguh RSA1 fro this job.

You may get some clue from these logs  .also  from the error log clearley iwe can see "

TCP

      Provider: An existing connection was forcibly closed by the remote host "

this could be RFC connection problem from your BI system to ECC systyem.

Try repeating the Dalaload once again if you think everything is fine .

Regards,

Srini Chapa.

michael_ruth3
Contributor
0 Kudos

Hi,

Looks like it failed in the RFC communication. Check the user that is used in the RFC setup(SM59) to see if it's locked and then check the password.

Former Member
0 Kudos

Kindly Let me know which RFC got failed ?

Former Member
0 Kudos

John check this sap note , it matches your short dump description

Note 110169 - Report to correct BSEG, BSIS and BSAS entries

System log which you have updated does not cover time around 23:54 , thats when the short dump occured.