on 04-17-2012 7:44 AM
I have created one parameterized BPM which contains message mapping in repository and done configuration by passing parameters in Integration directory in PI 7.10.
It is having 3 parameters. But realised that need 2 parametes only. So i have changed the parameters in Message mapping, Operation mapping,
and BPM from Repository.
But now the Integration process in directory shows 3 parameters only.
How can i get reflected BPM in Integration directory.
Could you please help. Thanks
Delete the BPM in ID and reimport it with same name.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
just to check, pls see your BPM changes are activated in IR.
then in ID, delete your integration process.
then pls ask your basis team to do a full CPA Cache refresh by using url:
http://hostname:j2eeport/CPACache/refresh?mode=full
by using PIDIRUSER.
then reimport your BPM in ID again and see if the changes in BPM are showing in ID.
Follow these steps;
1. Go to ID and deleted the imported integration process and activate
2. Go to ESR and check the cache status. Are there any errors for this BPM?
3. Go to SXI_CACHE and under integration process, delete the work item for your BPM
4. Reimport the BPM into ID
5. Go to SXI_CACHE and reactivate the BPM.. make sure you get a return code of 0
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
93 | |
10 | |
10 | |
9 | |
9 | |
7 | |
6 | |
5 | |
5 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.