Recurring Inspection

former_member216607
Participant
0 Kudos

Dear SAP,

          I want to create a recurring inspection for my Warehouse material.The lot to be create every 15 day.I activate the inspection type 09,but the inspection lot is not get creating.So is there special configuration is required if yes then pls tell the steps that follow to create the recurring inspection.

Best Regards,

Asif

Accepted Solutions (1)

Accepted Solutions (1)

Former Member
0 Kudos

1) Define Inspection Interval in QM material master view.

2) In QM material master view , inspection setup activate 09 inspection type (tick on active)

3) Make quality plan for that material using '09' usage.

4) In QA05 , define a varient

5) select that defined varient and put that material, plant and batch. please tick on " to inspection lot creation" (in maintain varient screen). If you don't do this lot will not be generated.

6) select the varient and then press schedule tab.

7) click on scedule one / periofically and select the desired frequency.

😎 as per defined frequency system will that program and lot will be generated auromatically. If you want to generate lot immediatly.

9) check the effect of this on that batch, in MSC2N system will display next inspection interval based on data you maintained.

10) In QA32 put material, batch and 09 type, the lot will be displayed.

Answers (1)

Answers (1)

Former Member
0 Kudos