on 04-12-2012 6:26 AM
Dear gurus,
i made a quality plan on dated 07 .04.2012 ,now i changed the date 01.04.2012 in table MAPL ,but in qp02 system is showing created date 07.04.2012
when i check in table it is 01.04.2012
siva
I am not sure what date in QP02/03 you expect to see changed?
The MAPL is the materials assignment table that maps the materials to specific inspection plans. The key date in the MAPL table is not displayed anywhere that I can see in QP02/03. I would expect to see it on the materials assignment screen if anywhere, but no date fields are shown in that screen. Since you can assign multiple materials to a plan, MAPL maintains a date of when the material was added to the plan.
The valid from date shown in QP02/03 in the plan header comes from table PLKO, the plan header table. So any changes in MAPL will not effect that.
FF
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
They aren't the same fields. If he updates the MAPL table the PLKO does not get updated. They are are in different tables!!! Even in the system, they are not in sync.
Below is table PLKO showing a plan with fields DATUV (Valid from) and ANDAT (Created).
The dates are in sync when you create the pland and add the first material. But if you assign a second material to the plan at a later date, then the record in MAPL for the second material reflects the newer dates. The field PLKO-DATUV (Valid from) is not updated.
So I don't undertand how you say they are the same?
I'm also not sure how the final answer on this post reflects the original post?
FF
Here are my final Input on this:
1.Directly changes in table to not affect QP02/QP03 but they are valid.Means changes done in task list valide from date will affect new creation lot.
2.Created on date never changes in QP02/QP03 even if change in table.Fist date of task list creation remains same & never changes.
3. Valid from date changes only if change is with reference to change number.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Interesting that you have changed the date in MAPL ,which i never advisable.
I am not sure why & how you did it but , Visit the Inspection plan header and try to change something like "put a dot " in the short text " etc and check both the entries!
Note that QP02 qill always show the "Valid for date" & "created on date " same unless you do some changes ,Also note you can not change "Valid for date" of a Inspection plan.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
100 | |
12 | |
11 | |
6 | |
6 | |
4 | |
3 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.