cancel
Showing results for 
Search instead for 
Did you mean: 

Control chart based on Inspection lot created on

Former Member
0 Kudos

Hi,

We have situation in production system that, the inspection lot numbers generated are in random. We have a buffer of 50 on the number range as standard. Not modified. (We have 4 application servers in land scape, when ever individual user access they may log in to different servers based on availability. This was the reason known for random number generation)

We have configuration for control chart as attached document. The issue is we are getting control charts by inspection lot number. But they are not as per the sequence based on created date and time. We want to achieve the X axis based on created date and time. The graphic design config screen shot is also attached. The X-Axis is maintained ad Object Axis.

Please suggest it it possible to achieve the required functionality by standard config or do we have to go for development.

Regards,

N.Nagaraju

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member207800
Active Contributor
0 Kudos

Set 'time of creation' for reference axis of your control chart.

Regards, Do Wook KIM

Former Member
0 Kudos

What SPC criterion do you have set to use?

Former Member
0 Kudos

Hi,

We are using SPC criteria 110 Task list charac./material/work center .