Hi QM Expert,
I have following two conditions for stability study
1. ACC CONDITION
0, 1, 2, 3, 6 MONTHS
2.LONG TERM
0,3,6,9,12,18,24,36
When I make Maintenance package in ip 11
0, 1,2,3,6,9, 12,18,24,36
And assign this Maintenance package in CWBQM in for stability inspection plan.
While processing the stability study in notification I am assigning this task list in change testing schedule (action box)
For ACC & Long term
After executing stability study when I check in QST06 the dates are not coming as per schedule, it is overlapped
Like for ACC it is nor as per 0,1,2,3,6
Or for long term
0,3,6,9,12,18,24,36
How to configure the above scenario if I want to schedule actual date as per due date
Pls Help
AAdi
Yes,Idea is to create two distinct Items ( with different task list & maintenance package ) by defining distinct storage condition.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi
Please create two separate task list with separate groups. Then load these task list in CWBQM. Then against each task list, assign the maintenance package as required. It should work.
Thanks
Sachin
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
95 | |
11 | |
11 | |
6 | |
6 | |
4 | |
4 | |
3 | |
3 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.