cancel
Showing results for 
Search instead for 
Did you mean: 

Stability study scheduling

Former Member
0 Kudos

Hi QM Expert,

I have following two conditions for stability study

1.    ACC CONDITION

         0, 1, 2, 3, 6 MONTHS

       2.LONG TERM

         0,3,6,9,12,18,24,36

When I make Maintenance package in ip 11

0, 1,2,3,6,9, 12,18,24,36

And assign this Maintenance package in CWBQM in for stability inspection plan.

While processing the stability study in notification I am assigning this task list in change testing schedule (action box)

For ACC & Long term

After executing stability study when I check in QST06 the dates are not coming as per schedule, it is overlapped

Like for ACC it is nor as per 0,1,2,3,6

Or  for long term

         0,3,6,9,12,18,24,36

How to configure the above scenario if I want to schedule actual date as per due date

Pls Help

AAdi

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

Yes,Idea is to create two distinct Items ( with different task list &  maintenance package ) by defining distinct storage condition.

Former Member
0 Kudos

Hi

Please create two separate task list with separate groups. Then load these task list in CWBQM. Then against each task list, assign the maintenance package as required. It should work.

Thanks

Sachin