Multiple open inspection lots in Inspection type 13(REM)

Former Member
0 Kudos

Hello SAP Experts,

There is a business requirement from my client to have more than one open inspection lot in Inspection type 13. In standard SAP system allows to create a new inspection lot only after the existing open inspection lot is completed. Do we have a possibility to overcome this restriction ?

Thanks & Best Regards,

Hemant Kumar B

Accepted Solutions (0)

Answers (4)

Answers (4)

former_member184536
Active Contributor
0 Kudos

Dear Hemant

"You can only create inspection lots for the production versions for which no open inspection lots

currently exist.

If an inspection lot already exists for a production version, you must first complete the current inspection lot before you can create a new one.You can select several production versions simultaneously and create individual inspection lots for each of the selected versions."

So In standard SAP , there is no functionality to create more than one lot for a material against  a particular productin versions. So you can do as the other guys suggested, with the help of insepction point.

Manish

former_member207800
Active Contributor
0 Kudos

The inspection point is useful for your requirement.

And one more way in standard is possible, I think, but not tested.

Cancel old inspection lot > Create new lot > Reset old lot

Regards, Do Wook KIM.

Former Member
0 Kudos

There is a business requirement from my client to have more than one open inspection lot in Inspection type 13

As we know Inspection type 13 ,inpocess inspection lots are created for production version qty,that is whole qty & can not be created partially or multiple.There is no std way to achive same.

anup_patil3
Active Contributor
0 Kudos

Hello Hemant,

Normally, for in-process inspection we use "Inspection Point" function, so that we can record all QM related activities happened at different inspection points/places in a single Inspection Lot.

No need to create more than one inspection lot. You can set 'Inspection Point' in respective inspection plan. Check & revert.

Hope this will help.

Regards,

Anup

Former Member
0 Kudos

Hi Anup,

Thanks for your feedback. Our client does not want to use "Inspection Point"  as the Inspection lot would remain open for a long time. They want to have separate inspection lots and make Result recording and UD for it.

Thanks,

Hemant

Former Member
0 Kudos

Yes ...Its apossible. Again by Inspection points only,

Explore the option of the "Partial  Lot assignment " In the task list header.For inprocess inspection task list in header define Inspection point along with this seting ,which will create partial lot as per your requirement for Inspection point.You can Do result recording & take UD for this partial lots as per you convinience.