on 04-03-2012 7:24 AM
If you see high CPU utilization and the performance deteriorates over time after an IPL, you may want to check PTF SI45959 for APAR SE50953. It fixes a problem that was recently discovered and caused some performance problems at another customer.
Kind regards,
Christian Bartels.
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Thanks for the update.... I was on vacation for 1 month... that's why i could not reply. We are already having this PTF applied 5761SS1 SI45959. We are using XND driver less connectivity to connect the application servers. Are there any post upgrade activities to be carried out after upgrading to V6R1 and changing the H/W to Power 7 770 machine (upgraded from power 5plus 750).
Regards
Harish
Whatever SAP is knowing about problems with the upgrade to IBM i 6.1 (V6R1) has been summarized in SAP Note 1148480. If the recommendations in that SAP Note do not help, it will be necessary to analyze the problem in more detail by a consultant or through a ticket in the SAP organization. It will be very hard to compare today's performance at V6R1 with the V5R4 performance of April 2012 directly, so I would focus on bottleneck identification in the current system rather than trying to compare with the status as it was 8 months ago.
Kind regards,
Christian.
Hi Harish,
I think, there needs to be an intensive performance analysis before we can useful recommend anything here. I do not see a good reason, why V5R4 should be a lot slower than 6.1 ... My impression would be:
Each OS needs a bit more ressources itself ... so, I would expect no change or a slight degradation in performance when upgrading the OS on the same hardware.
As we chatted a while ago, you know, that we cannot really help you just based on these kind of forum chats.
Regards
Volker Gueldenpfennig
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
My impression also was system performance deteriorates slightly in new OS on the same Hardware. But it has deteriorated by 30 % which is not acceptable. I had put in this forum to understand I have missed any steps while carrying out the upgrade. We had parallely raised message with SAP.
Regards
Harish