former_member216607
Participant
0 Kudos

Hi,

In my scenario i want to do a Usage decision with out doing the result recording,so i can i do that.and what are the steps for that process .

Accepted Solutions (0)

Answers (2)

Answers (2)

former_member42743
Active Contributor
0 Kudos

Actually, you should, in the inspection type setup for the material, make sure the field "insp with charc" is turned off.  When  you do that, you will not be able to record results even if an inspection plan or characteristics are set up for the material.  It only allows a UD to be made. 

If you don't make that change, several of your inspection types, under standard SAP will be expecting an inspection plan or material specs to be set up and will be looking for them.  In that case your inspection lots would wind up with a "CRTD" status and you will be unable to process them.  You won't be able to make a UD on them. 

FF

Former Member
0 Kudos

Nothing....Just go to QA12/QA32 & take UD .

As per std SAP there is no need to d Result recording for Usage decision to be done.

former_member216607
Participant
0 Kudos

Thanks sujit Gujar