hi,

i am creating a work centre and for costing purposes i need to give the activity type and the cost centre.

even though i have defined an activity type and in it used an allocation cost element which in term is assigned to a cost centre,in the work centre when i search for the activity type the system shows an error.....No activity types assigned to cost center X, controlling area Y on 07.02.2007 where X and Y are variables ofcourse.

what could be the possible reason?

thanks and regards

shekhar

Accepted Solutions (0)

Answers (2)

Answers (2)

Former Member
0 Kudos

hi,

the issue stands resolved.even after having all the things right i had not planned the activiity type using KP26.in fact kp26 is the actual transaction where u can assign an activity type to the cost centre.

thanks and regards

shekhar

former_member201206
Active Contributor
0 Kudos

Hi shekhar,

Check using KL02 or KL03 again, especially the validity dates of the activity type and may be the coster center KS02, KS03 as well. I hope, that controlling area is fine.

There must be some settings wrong, ...