Goods movement from SLOC to SLOC using LT11

Former Member
0 Kudos

Hi   I am having an issue while doing LT11 (here they use. There is one plant and one warehouse. PP interface is active. Production Supply area has been defined and storage location has been assigned in that. An storage type and Bin has been defined in Control Cycle.  The situation is   First the material will come to General storage location and from there when an production   order comes, the material will be moved to the assembly line Storage Location.  For me now when  i do an transfer order and confirm the TR from production in LT11 or (here   they use a Z transaction) for the TR from production the material is not moving from the   general SLOC to the Assembly line SLOC. Am i missing any config, please let me know.

Please help me.

Thanks

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Please check if you are doing Pick +transfer or only Pick in LT11.If you are only picking (if separate confirmation active in W/H) it will not do the job.

Also check whether both the storage locations are assigned to the warehouse in table T320.