on 02-01-2007 5:56 AM
Hi Experts,
I am releasing the final forecast(9AMANUP) from DP to SNP, but when i select the planning book of SNP no forecasting fields filled with values in the planning book.
My question is how we can ensure that the releasing is properly done from DP to SNP.
Thanks in advance
Regards,
A.Fahrudeen
Hi Fahrudeen ,
You can ensure the demand plan release done properly or not ,as below .
1. Check in the Result Log box where you can see the results of release if successful or with error .
2. Check if you have rightly entered the Proposed strategy under Demand Tab Page of Product Location master.
3. Check what category FA, FB you have entered in the release Profile. If no category has been set it will take from the Proposed strategy as per point 2 else is nothing is mentioned it will take FA by default.
4. You can check the demand elements like PIR ,Forecasts in <i>/n/sapapo/rrp3</i> .
Regds ,Digs...
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hai Digs,
Thanks for your fast reply, i follow the same procedure to releash the dp forecast to snp as you wrote, but still i am getting any value in the snp planning area.
I tried in both ways i.e first i released the 9AMANUP then i do it for 9ADFCST, in the both the cases i am getting any data's in the planning area of SNP.
Thanks alot.
Regards,
A.Fahrudeen
Hi Farudeen,
Can you check if the Product and Location characteristics are correctly mapped in the Release to SNP (/SAPAPO/MC90) and also that the location-product codes match between DP and SNP. Basically if you use say characteristics in DP as Z_MATERIAL = 9AMATNR in SNP and Z_CUSTOMER = 9ALOCNO in SNP then the characteristics values for Z_MATERIAL and Z_CUSTOMER should be exact same as the location-product master data (9AMATNR and 9ALOCNO).
Also check the results log for the Release (better run Release in background) and provide details for troubleshooting.
Thanks,
Somnath
Hi ,
I hope you have taken care of ..
Active model assignment to Location-Product comb'n if data directly loaded in DP.
If you are not using a standard Characteristics as 9AMATNR and 9ALOCNO in source planning area of DP for Material and Location then specify the actual Characteristics in Extended Tab for both.
I have created a data for checking this scenario and Log I am getting are <b>Characteristic Combination of Location-Product</b> and <b>Forecast Release with Green Signal</b> and Log will be the only better option to check if the data is released .
I think these are the only possible reasons ,pls let me know if get right one ...
Tnks ,Digs...
Hi Fahrudeen ,
Pls check ..
1.Customizing (SPRO) in Maintain Category Groups <u><b>DF1</b></u> you have set the category which is used in SNP release porfile
2. And If you are using SNP planning area other than 9ASNP02 then check in your Planning area ->Key Fig tab->Details you have defined the same Category Grp DF1 and category for 9ADFCST
Normally FA category is used for releasing to SNP .
Hope this helps
Regds,Digs...