on 01-31-2007 1:53 PM
Hi,
I have 2 JOB scheduled on transaction SCOT (and SM37).
This JOB are:
NOTESCONNECTEXCH
SAPCONNECTEXCH
both are related to the program RSCONN01
I have noticed that every job is scheduled every 1 minute and every time this job run, create a log into directory:
\usr\sap\SID\SYS\global
The log file name start with WF_LOG_xxxx
Due to the frequency of the job a lot of LOG is created on server and sometimes I have some DISK space problem and some ABAP DUMP (related to missing space on disk!).
My question is:
is it correct to schedule this job every minute and how I can do for do not create the log at every run?
Regards
Hi Cocco,
RSCONN01 starts the sapconnect send process.I dont think it should scheduled to run every min rather i would say every 10-15 mins.But it depends on your business and how fast you want to send out the mail from SAP. The log WF_LOG_xxxx is related to workflow i think
Thanks
Prince
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
90 | |
10 | |
10 | |
10 | |
7 | |
7 | |
6 | |
5 | |
4 | |
3 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.