cancel
Showing results for 
Search instead for 
Did you mean: 

cFolders 4.0 & MPN

Former Member
0 Kudos

Hello, I would like to transfer the linked MPNs along with the Material from ECC 6.0 to cFolders 4.0. I created a material and in the purchasing screen I included MPN. In transaction CFE02, I clicked the check box for "Include linked Manufacturer part number". After transporting the material to cFolders 4.0, I could see only the material gettting transported but not the MPN. Could someone guide me on this?

Accepted Solutions (0)

Answers (1)

Answers (1)

Former Member
0 Kudos

Resolved on my own