on 01-25-2007 8:05 PM
Hi all,
We will be upgrading our system from R/3 4.7x200 to ERP2005, and we have recently successfully upgraded our sandbox R/3 4.7x200 system to ERP2005, all pretty much without too much of a hassle. Now we are planning to do a unicode conversion on the same sandbox system, to get some idea about the runtime of such a conversion. The problem is that we are short on time, and I wonder what the effects will be if I skip some of the steps that should be done before we begin with the actual conversion phase (R3load). I have done some of the pre-conversion steps, but not all, and I wonder if there are some that I absolutely MUST do in order to get through the actual conversion?
In the end, we are not looking for a functioning system after this test conversion, we are only interested in the runtime and downtime findings.
Regards,
Thomas
Hi,
You cannot skip same conversion step.
the good ideas is to use the released method by SAP to do upgrade/conversion at the same time. this will save you time.
check OSS note
Note 928729 - Combined Upgrade & Unicode Conversion FAQ
Good Luck
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
-
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
User | Count |
---|---|
85 | |
10 | |
10 | |
10 | |
7 | |
6 | |
6 | |
5 | |
4 | |
4 |
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.