on 01-25-2007 8:34 AM
Hi All,
I have been trying to upgrade the patch level of our solution manager 4.0 system to configure scenario for CRM but when I am applying pathes for BBcrm and ST ie SAPKITL413 and SAPKU50003 its hanging in the import phase 2 with the message "MAIN IMPORT finished with return code 4" and stays there.I checked the background job and it is still active.
Previously I had the same problem and my SPAM status became RED.I deleted the queue from the PAT01 and PAT03 table where the status was '?'. and the tried applying the patches again ,but the same thing happened and the patches hanged at the same phse.
This is very urgent
Thanks in advance.
Amit
HI ,
I checked all the logs ,all the steps are finishing successfully and there is even no warning.But the implementation of patches hangs in the phase Main Import which shows the status as "MAIN IMPORT finished with return code 0"
Even when I tried to apply SPAM\SAINT package it hanged in the same phase and didn't move on for a long time,ultimatly I have to stop the import.
I am not able to incerease the patch level of any of the component.Does any one guide me ,what to do in this scenario.
Thanks in advance
regards
amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
I have the latest patch of SPAM and SAINT, can there be any other reason.
This is very important for me.Your help will be of high importance to me.....
Regards
Amit
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
Hi,
Did you upgrade your SPAM and SAINT before applying these patches.
Feel free to revert back.
--Ragu
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.