on 01-18-2007 12:57 PM
Hi,
i have R/3 IDES 4.7 , i created standard background jobs throuth SM36 with default time and dates, due to this reason my system is noe very slow. now i want delete that standard background jobs or i need to reschedule the jobs ..
how can i , if i try to del in sm37 it is saying i am not able to del sehedule ar ready or active jobs.
if i do modification(data and time) in sm36 it says "already jobs are scheduled if do re- schedule it create load the server."
please tel me what to do now.
regards,
swathi-k
Hi Swati,
Execute transaction SM37 and Please 'Cancel' the running job first using Menu option 'Cancel'.
Now once it shows status as 'cancelled' , you can go ahead to reschedule that job using option 'repeat scheduling'.
Regards,
Siddhesh
You must be a registered user to add a comment. If you've already registered, sign in. Otherwise, register and sign in.
It the job got cancelled, do not worry about it. Just define a new job with a new name.
I hope you could cancel the job.
If you are new to SAP and job scheduling, please read this help manual.
http://help.sap.com/saphelp_47x200/helpdata/en/c4/3a8009505211d189550000e829fbbd/frameset.htm
Regards,
Siddhesh